PROJECT in a box comes prepopulated with a 4 Step PM method template.

4 Step is very similar to 3 Step and has the same project level management documentation but supports the use of stages/work packages where additional packages of documentation can be inserted into the project at any point.  It uses PRINCE2 templates for consistency and feeds date to Project Controls, Status Reporting etc.

A 3 Step project can be upgraded to a 4 step project at anytime by simply switching the method template associated with the existing 3 step project.